Search:  
  Contact  |   Advertise  |   Advanced Search
   Get SGN's free email alert
    What's in the SGN email?  |  Twitter |   Facebook |   Linkedin |   RSS


Title
Smart Grid Services: Stimulus Money at Work: Aldridge Electric - the Final link to IIT’s Perfect Power Project
Description
Aldridge Electric Inc. recently completed work on the third phase of the Illinois Institute of Technology’s (IIT) Perfect Power pilot project in Chicago; one of only nine Smart Grid projects selected last summer to receive Department of Energy stimulus funding. Once complete, the pioneer project guarantees continuous service or “perfect power” throughout the campus by creating redundancy and an intelligent electricity distribution system that interfaces with a campus-wide energy system controller. The Aldridge Electric crew worked weekends and off-campus hours to safely complete the installation of all the electrical switchgear, controls, and medium voltage and fiber optic cable.
Date
Feb 16, 2010

Smart Grid News Updates

Smart Grid: The Tuesday Topic - Smart Grid News - Grid Modernization and the Smart Grid

 THE TUESDAY TOPIC

Is the smart grid industry stalled? Or accelerating?

We're getting mixed signals about the vitality of the smart grid market. On the one hand, the recent DistribuTECH conference was one of the most successful ever. On the other, a well-known Wall Street analyst recently told his clients that the smart metering sector is "facing several headwinds," including weak regulatory support in the U.S. and delays in European adoption. Taking the pulse of the smart grid industry is this week's Tuesday Topic.

Click to the discussion now >>


 EXPRESS MENU
 READER FAVORITES
 MOST POPULAR


 © 2012 SmartGridNews - Privacy Policy